Restoration Background
Since 2014, when the church and rectory had been placed in the full care of the Misson Saint Irénée de Lyon, a great many repairs and restorations have been completed.
To fund these projects, the Mission secured several grants through a cost-sharing programme with Le Conseil du patrimoine religieux du Québec. Under this arrangement, the government supplied 70% of the funding for every 30% raised by the Mission.
This programme was paused in June 2025 – the government no longer co-finances any renovation projects. Any repairs we now undertake must be funded entirely by your donations to St. Irénée.
Current Project
South-Facing Windows Repair
Goal: $400,000
Raised to date: $55,500
(As of July 11, 2026)
Following the successful front and South-facade window restoration, a similar endeavour is urgently needed for the North-side of the church. The frames and sashes will be dismantled, boarded up temporarily; repaired and repainted in our local contractor’s workshop in Rosemont-La-Petite-Patrie. Once rehabilitated, the windows will be reinstalled. Careful attention will be paid throughout to preserve the building’s unique heritage.
Future Projects
- Repainting the ceiling above the altar.
- Repainting the front doors.
- Restoration of side choir seating.
- Mass times signage.
- Repainting ceiling in the staircases.
- Restoration of artworks (Raising of Lazarus, Ascension of our Lady).
- Submit your suggestions here.
Past Projects
North-Facing Windows Repair
Complete restoration of 75 exterior shutters and their large wooden frames. Traditional re-glazing of all panes.
Completed: 2024.
Contractor: A. Charbonneau Inc.
Main Bell Tower
Reroofing, restoration of the crucifix at the top of the bell tower.
Completed: 2022.
Contractor: TBC.
Rectory Renovations
Kitchen, library and drawing room.
Completed: 2020-2025.
Organ
Faithful restoration of the organ’s internal mechanisms, original 1910 pipework, and historic casework, preserving its defining visual and musical character.
Completed: 2021.
Contractor: TBC.
Baby Room
Nursing chair/corner added, plus video streaming facilities installed in the basement for families with young children.
Completed: 2021.
Contractor: TBC.
Altar Rails and Refurbishment of the Sanctuary.
Restoration of altar for Our Lady, the reintroduction of a communion rail, and new flooring throughout the sanctuary.
Completed: 2019-2020.
Contractor: TBC.
Reinforcement of the structure under the Sanctuary.
Addressed sagging flooring and bathroom facility renovation.
Completed: 2018